June 14th..well I started this on June 14th. Today is actually June 28th

As luck would have it, either good or bad, we are having the same dry weather this summer as we did last yr. That's great for the other Clubs in town that are renovating their golf courses, stinks for us because we need the rain to give a reprieve from the demand on the re-use irrigation water system. With 2/3 of the population gone in the summer there is nobody here taking showers and flushing the toilets to supply the effluent treatment plant with "supply" that ultimately gets turned into irrigation water for golf courses. That's a long story for telling you that we have no irrigation water! As many of you know, we receive our water from the City of Naples and due to the lack of supply, we have been getting shut off 2 out of every 3 days. That makes maintaining a golf course in the summer very very hard, especially when it comes time for our summer maintenance. Despite our water challenges we are doing fairly well so don't get too alarmed. It's just that when things get dry, it's not because we don't see it; it's because we can't water it.

Despite all of our current challenges, things at the Club at moving along well. We are getting our list of "to do's" done as fast as we can. We have been in a holding pattern to start the installation of the new landscape enhancements as well because of the water situation. There's no sense in trying to plant new material and have to worry about it dying because I can't water it. But, it will rain...I guarantee it!

As part of our summer improvements regarding water, we have started installing additional sprinklers where needed to increase our irrigation application efficiency.
Areas on slopes facing away from sprinkler heads are where application weaknesses show the worst, so that's where we've been concentrating.

Here, on the back of 1 blue tee and the slope is a good example. All of the irrigation water from the larger heads shoot over the area that is dry.
Photobucket

To alleviate the localized dry spot we added a small head at the bottom of the slope, shooting up the slope, to cover the area.
Photobucket

Here on #15, the cart path side of the bunker where the slope falls away from the large sprinkler head, I had irrigation added as well to help with the same problem.
Photobucket

As you know, the Club embarked on a new program this year of closing for 5 days in a row to enable golf maintenance to perform all of the necessary tasks to keep the course in top shape. Our first week went very smoothly. We were able to complete the aerification of all greens, tees, approaches, collars, fairways, and roughs in about 3.5 days (thank you Board members for buying the Club those wonderful new aerifers). Due to the lack of available irrigation water, I reduced our maintenance scope a little bit as I didn't want to beat the course up too badly then struggle to nurse it back to health, but we did get 75% of what we had hope to do done.

Here's our new green's aerifier doing it's job perfectly. Thank you CCN for purchasing this new machine.
Photobucket
Photobucket

The fairways and roughs were also aerified during the closure. The front 9 went super smooth, the back 9 was a little bit...well let's just say rocky. I knew this was going to be the case. During the renovation the back 9 is where we dug up all of the rock and the front 9 was were we dug up all the sand. Makes sense, right?! Here is just a little example picture and video of what we ran into on the back 9 fairways.
Photobucket


On this video, when the aerifer head jumps...that's a rock.


After aerification of all of the fairways, I lowered the height of cut on the large pull frame cutting units and circle cut the fairways...literally mowed them in circles. The circular motion or twisting of the cutting units allows them to be much more aggressive in their cut as compared to just straight line mowing as you normally see. The result is a "scalped" look. The scalped areas are where the grass had become very "grainy" or laid over and the circle cutting just cut it off. By doing a lot of circle cutting in the summer, a more erect growth habit is promoted. The erect growth allows the ball to sit up on top of the grass blades better rather than lay in the grass.

Here's the process of circle cutting.


After circle cutting. Its ugly, but only last about 4-5 days.
Photobucket

Here is a pic of #5 fairway after the aerification and circle cutting.
Photobucket


A new challenge that came along with the new course is trimming all of the landscape grasses. Luckily they are off to the side and we can work on them slowly throughout the summer because this is a huge job. The grasses require very little maintenance, but the maintenance they require is very labor intensive.
Photobucket

Another one of the summer's big projects was to eliminate some cart path on hole #12 behind the green and turn it into a grassed area. This will help with balls that roll over the green and give you additional grass area to allow the ball to try and stop. Although it is a relatively simple project in concept, it was difficult to do. The main reason for the difficult was that we had to remove the cart path material that was as hard as concrete. To get the upper hand, I rented a small bucket loader to scrape out the cart path materials.
Photobucket

Then the staff brought in some fill dirt to raise the elevation a bit to create a mini backstop effect.
Photobucket

To save sod costs, we tied in the ground preparation for the new landscape enhancements on #8 with the cart path removal project. Since we were going to spray out and kill the grass on #8 where the landscape enhancements were going in we just cut sod from there to use for our project on #12. We were able to cut enough sod from #8 we didn't have to buy any new sod.
Photobucket
Photobucket
Photobucket

As you can see, we are staying very busy. Lots to do and only a few more months until everyone returns. Yikes! Gotta go, time to start another project.